Metro trains should run between Sealdah and Sector V in the East-West corridor by the end of 2021, general manager Manoj Joshi said on Wednesday.
“Sealdah station should be ready and commercial...
The Union cabinet on Wednesday approved the completion of the East-West Metro at an estimated cost of Rs 8,575 crore, which will boost public transport in the city and reduce commuting time.
The targ...
East-West Metro got its first underground station on Sunday with the inauguration of Phoolbagan station. The station will be open for passengers from Monday.
East-West services have remained su...
The first of the three-day traffic diversion following the closure of the Sealdah flyover passed without too many glitches on Friday.
The number of vehicles on some of the main roads, including APC R...
Vehicles headed for the Sealdah flyover from north will be diverted from Shyambazar, Maniktala and Rajabazar, while those moving towards the flyover from south will be re-routed from the Exide and Mou...
East-West Metro on Monday started the trial of its automatic train control and signalling system that has minimal role of the driver, officials said.
The East-West Metro corridor — which, once ...
The chief commissioner of railway safety has observed that platform screen doors at Metro Rail stations were not required in the advanced train operations system for the purpose of safety and these wo...
Mamata Banerjee on Friday told the Bengal Assembly that she “felt bad” for not being invited to the inauguration of the East-West Metro corridor, recalling how she had to “shed tears” as the r...
More signage, better information and communication system and platform screen doors — Calcuttans got a taste of East-West Metro on the first day of its commercial run on Friday.Trains ran on a 5km s...
A family evacuated from Bowbazar’s Durga Pituri Lane after their house was damaged beyond repair in the subsidence triggered by East-West Metro work will not be buying new clothes this Puja.Brothers...