The dates for a load test of Bijon Setu, which had been scheduled before Durga Puja but postponed to avoid a traffic mess during the festive rush, could be decided on Friday, officials associated with...
The one-year-old flyover connecting Jinjirabazar with Budge Budge was shut down on Wednesday morning after a crack was detected, said officials of the Calcutta Metropolitan Development Authority (CMDA...
The Calcutta Metropolitan Development Authority wants Bijon Setu closed for three days at the earliest for a study of its condition.Officials said the CMDA, the custodian of the bridge, wrote to Lalba...
The Calcutta Metropolitan Development Authority will clean up 88 “legacy dumping sites” in the state except in the Calcutta Municipal Corporation, Bidhannagar Municipal Corporation and Howrah Muni...
The urban development department will overhaul the Cossipore bridge in a few weeks so that it can take the extra load of vehicles once the Tallah bridge is shut down and diversions start.The Cossipore...
The flyover that connects the EM Bypass to VIP Road near Ultadanga will be closed to traffic for most of Sunday to make way for load-bearing test. “The flyover will be closed from 6am to 10pm on Dec...
A four-year-old boy was crushed to death under the debris of a defunct office that was being pulled down in Nonadanga on Tuesday morning.Angry neighbours held a protest, refusing to let police remove ...
Traffic was thrown out of gear in and around Sealdah on Friday, the only working day in the four-day period when the flyover will remain shut to facilitate its safety audit and load test. An engineer ...
The Sealdah flyover was shut down to traffic for four days from 6pm on Thursday to facilitate a safety audit and repairs on the structure. Engineers of the Calcutta Metropolitan Development Authority ...
The Sealdah flyover is set to be closed for four days from the afternoon of August 15 to facilitate load-bearing tests on the structure, officials said.A formal notification on the closure is ye...