MY KOLKATA EDUGRAPH
ADVERTISEMENT
Regular-article-logo Wednesday, 17 December 2025

Water-ready Bhubaneswar

De-silting work at (top) Saheed Nagar and (above) Madhusudan Marg, Unit-III in Bhubaneswar. Ahead of the arrival of the monsoon, the Bhubaneswar Municipal Corporation had taken up the drain de-silting work at various parts of the city to ensure the smooth flow of rainwater through the drains and no waterlogging. Pictures by Ashwinee Pati

TT Bureau Published 18.06.16, 12:00 AM

De-silting work at (top) Saheed Nagar and (above) Madhusudan Marg, Unit-III in Bhubaneswar. Ahead of the arrival of the monsoon, the Bhubaneswar Municipal Corporation had taken up the drain de-silting work at various parts of the city to ensure the smooth flow of rainwater through the drains and no waterlogging. Pictures by Ashwinee Pati
Follow us on:
ADVERTISEMENT
ADVERTISEMENT