ADVERTISEMENT

In pictures: Kolkata Orange Line Metro work at Chingrighata crossing gains momentum

The work will continue till 8am on May 18 on the western flank

My Kolkata Web Desk
Published 17.05.26, 01:24 PM

Kolkata Police announced a series of traffic diversions and partial road closures near Chingrighata as work resumes on the stalled 366-metre stretch of the Orange Line Metro corridor.

1 6

The western flank has almost been completed

Photos: Amit Datta
2 6

Traffic restrictions were enforced in two phases across two weekends in May

ADVERTISEMENT
3 6

Vehicles using the Chingrighata flyover towards Salt Lake are channelled through diversion route before reconnecting with the bypass through a right turn towards Bidhannagar Police Commissionerate

4 6

All vehicles travelling towards Salt Lake and the airport are being diverted off the bypass in front of NX Hotel

5 6

The work will continue till May 18, 8am, on the western flank

6 6

Police are advising motorists to plan journeys in advance and expect delays around the EM Bypass corridor

Kolkata Metro Metro Work Chingrighata Metro
Follow us on:

MORE IN PICTURES

ADVERTISEMENT

Share this article